Uttarakhand Integrated and Resilient Urban Development Project - Additional Financing
by Asian Development BankDehra Dun, India
Imported from IATI · publisher data as of Sep 29, 2026
0 followers
Timeline
Dec 13, 2023 – Jun 20, 2030
About this project
The overall project's impacts remain unchanged from those of the ongoing project (L4148). The project is aligned with the following impacts: (i) universal and equitable access to safe and affordable drinking water improved, and (ii) access to adequate and equitable sanitation and hygiene enhanced to end open defecation. The overall project will have the same outcome and will include the names of the additional project towns under the additional financing. The additional financing will have the following outcome: reliability and efficiency of resilient WSS services in Dehradun, Haldwani, Nainital, and Tanakpur enhanced. The overall project has the same four outputs but is modified to reflect additional towns under the additional financing. Only the additional components under each output of the additional financing are described below. Output 1: Resilient water supply system and service in Haldwani, and Tanakpur improved. By 2030, the additional financing will construct about 817 kilometers (km) of piped water supply networks in the western part of Haldwani and the entire town of Tanakpur to replace the existing 209.8 km water supply network, which has significant leakage. The new network will ensure a reliable and quality 24-hour continuous water supply system with a standard of 135 lpcd. The additional financing will provide water meters to about 45,000 household connections, enabling more efficient water use and volumetric billing, including for at least 90% of identi…
Published details
View source- Published by
- Asian Development Bank · Multilateral
- Countries
- India
- Sectors
- Disaster Risk ReductionUrban developmentBasic sanitationBasic drinking water supply
- Places
- Dehra Dun, Nainital
- Implemented by
- Government of Uttarakhand
- Accountable
- Asian Development Bank
Documents and links
- www.adb.org/sites/default/files/project-documents/38272/38272-045-lna-en.pdf
- www.adb.org/sites/default/files/project-documents/38272/38272-045-rrp-en.pdf
- www.adb.org/sites/default/files/project-documents/38272/38272-044-38272-045-emr-en_2.pdf;https://www.adb.org/sites/default/files/project-documents/38272/38272-044-38272-045-emr-en_3.pdf
- www.adb.org/projects/38272-045/main#project-tenders
Published by Asian Development Bank to the International Aid Transparency Initiative (IATI), last updated 29 Sept 2026 and imported automatically. IATI identifier: XM-DAC-46004-38272-045-LN4407.
Support Uttarakhand Integrated and Resilient Urban Development Project - Additional Financing
Donations through Solarpunk Taskforce are coming soon. Until then, follow the project to get its updates and share it with people who might help.
Updates
No updates yet.