Alaoa Multipurpose Dam Project
by Asian Development BankSamoa
Imported from IATI · publisher data as of Sep 29, 2026
0 followers
Timeline
Jul 2, 2024 – Jan 31, 2032
About this project
The multipurpose dam is intended to increase flood protection, supply seasonal water, and provide additional hydropower. The primary objective of this proposed project is to enhance resilience to increasingly intense cyclones by mitigating Apia City flooding associated with extreme rainfall events on the upstream catchment of the eastern and eastern-central branches of the Vaisigano River. The secondary objective is to improve the stability of the water supply during dry periods and reduce the turbidity of raw water taken into Apia's main water treatment plant during flood periods. The tertiary objective is to install a hydropower capacity of 0.60 MW, generating 2.12 GWh of clean electricity. The project will support the government's 70% renewable energy target for electricity generation by 2031. The project will enhance non-physical flood management systems and capacity and the biodiversity conservation and management capacity associated with the proposed dam development.
Published details
View source- Published by
- Asian Development Bank · Multilateral
- Countries
- Samoa
- Sectors
- Agricultural land resourcesDisaster Risk ReductionBasic drinking water supplyEnergy conservation and demand-side efficiencyHydro-electric power plants
- Places
- Samoa
- Implemented by
- Ministry of Finance
- Accountable
- Asian Development Bank
Documents and links
Published by Asian Development Bank to the International Aid Transparency Initiative (IATI), last updated 29 Sept 2026 and imported automatically. IATI identifier: XM-DAC-46004-52111-001-GRNT0947.
Support Alaoa Multipurpose Dam Project
Donations through Solarpunk Taskforce are coming soon. Until then, follow the project to get its updates and share it with people who might help.
Updates
No updates yet.