Mechanized Irrigation Innovation Project
by Asian Development BankNepal
Imported from IATI · publisher data as of Sep 29, 2026
0 followers
Timeline
Dec 11, 2024 – Oct 9, 2030
About this project
The project will provide long-term sustainable solutions to increase year-round access to irrigation water in about 22,400 hectares (ha) of command area in Rautahat and Sarlahi districts of Madhesh Province in the Terai. This will provide increased climate resilience and water security to poor rural farmers by constructing a large-scale network of about 500 deep tube wells (DTWs) with dedicated and reliable electricity distribution networks. The management, operation, and maintenance (MOM) of the tube well irrigation schemes will be contracted to a third-party operator, using a design-build-operate (DBO) contracting modality. On-demand irrigation services will be provided to at least 121,000 farmers using innovative technology with a prepaid water metering system. The project will be the first of its kind in Nepal and will transition from traditional irrigation systems toward a more resilient and sustainable irrigation system.
Published details
View source- Published by
- Asian Development Bank · Multilateral
- Countries
- Nepal
- Sectors
- Food crop productionAgricultural water resourcesElectric power transmission and distribution (centralised grids)
- Places
- Nepal
- Implemented by
- Ministry of Energy, Water Resources and Irrigation
- Accountable
- Asian Development Bank
Documents and links
Published by Asian Development Bank to the International Aid Transparency Initiative (IATI), last updated 29 Sept 2026 and imported automatically. IATI identifier: XM-DAC-46004-52130-001-LN4501.
Support Mechanized Irrigation Innovation Project
Donations through Solarpunk Taskforce are coming soon. Until then, follow the project to get its updates and share it with people who might help.
Updates
No updates yet.